Project Description

Hickory Run Energy Center, PA

Date: Spring 2019

Location: North Beaver Township, Pennsylvania

Client: Kiewit

Hot and cold small bore pipe fabrication from carbon, stainless, P22 and P91 chrome and alloy 20. Scope included welding in over 500 valves. Scope also included the temporary steam blow piping in 30” and 24” diameters.

The Facility is a 2×1 CCGT, (2) 296MW Siemens SGT6 8000H Combustion Turbine Generators with CMI Duct-Fired Heat Recovery Steam Generators and a 358MW SST-5000 Steam Turbine Generator, producing 950 MWs. Description and photo courtesy of NAES. Learn more here.

pipe fabrication company